8 Strand (Approx 1″- 1 1/8″ wide) hand plaited Halter with self loops (no metal rings) and Extra Long rope lead.

8 Strand Plaited Halter Extra Long Lead
£58.00
| Product Colour | White |
|---|---|
| Size | Sec A standard width, Sec C standard width, Sec D standard width |




